EUDR Supplier Checklist for Plywood & Wood Panels
The 30 December 2026 deadline applies to plywood
Plywood (HS 4412) is squarely in scope of the EU Deforestation Regulation (Regulation (EU) 2023/1115, as amended by Regulation (EU) 2025/2650). Wood-based panels are one of the few product groups where micro and small enterprises share the same application date as large operators: 30 December 2026.
This checklist lists everything a buyer or importer needs to collect from a plywood or panel supplier. Tick the boxes as you gather each item, then print or save the page as a PDF for your compliance file. Records must be kept for at least five years.
1. Product identification
2. Origin and geolocation
3. Legality and chain of custody
4. Due diligence statement (DDS)
Copy-paste email to send your supplier
Paste this into an email and fill in the brackets. It asks for exactly what a due diligence file requires, in one pass.
Subject: EUDR information request — Dear [Supplier], As a business placing wood products on the EU market, we are required to complete due diligence under Regulation (EU) 2023/1115 (EUDR). To do so we need the following for the goods on our order [PO number]: 1. Full product description and HS code 2. Country and region of harvest / production 3. Geolocation of every contributing plot — GPS polygon (GeoJSON) if the plot is over 4 ha, or a single GPS point if it is 4 ha or less 4. Harvest or production date 5. Species used in the panel (core, face and back) 6. Evidence of legality — harvest rights, permits, and tax and environmental compliance 7. Your EUDR Due Diligence Statement reference, or your upstream supplier’s reference 8. Confirmation of any recycled content, with documentation 9. Any chain-of-custody certification (FSC® / PEFC) and certificate number Please send these before dispatch so we can complete our due diligence and clear the goods. Kind regards, [Your name] — MOMARK-SRO sales@momark-sro.com · +421 918 206 708 · https://momark-sro.com
What to keep on file for five years
- The due diligence statement reference and verification number
- Supplier name, address and contact details for each order
- Product descriptions, HS codes and quantities
- Origin, species and geolocation data as supplied
- Your risk assessment and any risk mitigation you applied
- Copies of legality and certification documents
Common gaps that delay clearance
- No geolocation at all — the most common failure. It applies to the plots that produced the wood, and plywood drawn from several plots needs all of them.
- Coordinates in the wrong format — polygons must be supplied as GeoJSON for plots over 4 ha, not as a centre point.
- No production date — you cannot demonstrate the wood post-dates the 31 December 2020 cut-off without it.
- Certification treated as a substitute for due diligence — FSC® and PEFC are strong supporting evidence, but the operator still has to file its own DDS.
- Missing a DDS reference — customs can ask for it before release for free circulation.
- Assuming the SME delay applies — it does not for timber: micro and small operators in the timber sector share the 30 December 2026 date.
How MOMARK-SRO helps
MOMARK-SRO supplies plywood and wood-based panels in bulk to trade buyers across the European Union. When you request a quote we can include the product, origin, species, HS code and chain-of-custody information you need to build your due diligence file.
Request a quote with compliance documentation or message us on WhatsApp: +421 918 206 708.
Related guides
- EUDR compliance guide for plywood & wood panel importers
- Plywood weight & volume calculator
- Bulk plywood buying & pricing guide — Europe
Disclaimer: general information, not legal advice. Always check the current text of Regulation (EU) 2023/1115 (as amended) and European Commission guidance for your situation.
